


Calgary Commercial Bakery Facility
Retrofit of Weston Bakeries commercial facility – all offices, warehouse, exterior and utility locations.
| Before: | 319 fluorescent T8 tubes; 5 highbay fixtures; 17 wallpacks |
|---|---|
| After: | 319 LED T8 tubes; 5 LED highbay fixtures; 8 LED T8 strip fixtures; 8 LED T8 vapour-proof fixtures; 4 motion sensors; 17 LED wallpacks |
| Annual Savings: | 48% reduction or 147,535 kWh |
|---|---|
| Payback Period: | 20 Months |
| 5-Year Cash Savings: | $89,700 |
| Gov’t Rebates: | N/A |